RSS
Filter
Activity Start Date: Select date in calendarSelect date in calendar
  

30 June 2015 
Specialists of the Kolskaya NPP studied best international practices on monitoring tightness of fuel within the WANO mission
The Kolskaya NPP held a mission of technical support * on "Leakage of fuel". The mission was carried out by the representatives of the Moscow Center of the World Association of Nuclear Operators (WANO) with the participation of experts of the Rovno nuclear power plant, Mochovce (Slovakia) and Paks (Hungary) NPPs.
30 June 2015 
The Kursk NPP passed inspection on civil defense and preparedness for localization and liquidation of emergency situations
Readiness of the Kursk NPP to localize and eliminate hypothetical emergencies to ensure safety and security was confirmed during the inspection, which took place on 22-26 June 2015. The inspection was performed by the Commission of the "Rosenergoatom".
26 June 2015 
The Rostov NPP: power unit ?2 included into the network after performing preventative repair
The power unit ?2 was included into the network after planned preventive repairs (PPR).
26 June 2015 
The Rostov NPP: power unit ?3 disconnected from the network, repair works carried out
The Rostov NPP power unit ?3, which is in pilot operation, was disconnected from the network by dispatcher’s application for scheduled repair works on June 24 at 23 o'clock. 20 min..
26 June 2015 
The Kursk NPP: power unit ?3 disconnected from the network for scheduled overhaul on June 24,
The Kursk NPP power unit ?3 was disconnected from the network for routine repairs on June 24, 2015.
26 June 2015 
The Leningrad NPP-2: preparing for "strait" on open reactor of first power unit in the spotlight
The main topic of this week's operational headquarters was to discuss the preparations for the key tasks of the year - strait of technological systems in the decompressed reactor.
26 June 2015 
All four steams are delivered to the Leningrad NPP-2 and ready for the installation process
The last batch of steam generators for power unit ? 2 was delivered to the Leningrad NPP-2. All four power units of the equipment are in place and ready for the installation process at the moment.
26 June 2015 
The Beloyarsk NPP hosted technical support mission by WANO
The Moscow Center of the World Association of Nuclear Operators (WANO) organized a mission of technical support on "introduction of modern methods of control of metal, including without decommissioning work (express control)" by the request of the Beloyarsk NPP.
23 June 2015 
The Smolensk NPP: power unit ?3 stopped for overhaul
The power unit ?3 of the Smolensk NPP was stopped for scheduled overhaul for a period of 21 days on June 19, 2015.
23 June 2015 
The Balakovo NPP: one of the power units temporarily off-loaded due to shutdown of 2 high-voltage lines 500 kV
The Balakovo NPP power unit ?4 was temporarily disconnected from the network due to shutdown of power transmission lines "Kuibyshev-1" and "2-Red Army" by the action of automatic equipment of the power system has been on June 20, 2015 at 16:03

Pages: Prev. 1 ... 184 185 186 187 188 ... 367 Next