The Bilibino NPP exceeded August plan for electric power generation by 13%

The Bilibino NPP fulfilled plan for electricity production at 113.5%, it generated 18,898 million kWh with the planned target of 16,649 million kWh in August 2015.

Consumers were released 14,655 million KWh (plan - 13,049 million KWh), supply of heat from the collectors was 3,563 thousand Gcal.

Recall, the planned average repair of the power unit №2 was completed ahead of repairs schedule for two days on August 8, 2015. It has been achieved thanks to good planning and optimization of repair and it allowed to produce on 343 thousand kwh more.

There were no violations of limits and conditions of safe operation in August 2015.

There are operating power units № 2, 3, and 4 of the nuclear power plant at the moment. The power unit №1 is in a planned overhaul. Dispatch task is being done.

The radiation background corresponds to the normal operation of power units and does not exceed natural background values at the plant and adjacent territory.