RSS
Filter
Activity Start Date: Select date in calendarSelect date in calendar
  

20 April 2020  COMMUNICATIONS DEPARTMENT OF ROSENERGOATOM
New robots at Rosenergoatom
New robots at Rosenergoatom
New digital assistants for workflow optimization and streamlined operational efficiency have been introduced at the Rosenergoatom Joint-Stock Company

16 April 2020  COMMUNICATIONS DEPARTMENT OF ROSENERGOATOM
The Digital Technology Center of the Rosenergoatom Joint-Stock Company is getting ready to launch a face recognition system at the Kalininskiy DC
The Digital Technology Center of the Rosenergoatom Joint-Stock Company is getting ready to launch a face recognition system at the Kalininskiy DC
The Rosenergoatom Joint-Stock Company has completed trial runs and is getting ready for the commercial launch of the biometric access video control system at its internal facilities housing the primary data center at the Kalinin NPP.

16 April 2020  INFORMATION AND PUBLIC RELATIONS DEPARTMENT OF LENINGRAD NPP
Wireless LTE and Wi-Fi technologies have been tested at the Leningrad NPP
Wireless LTE and Wi-Fi technologies have been tested at the Leningrad NPP
LTE and Wi-Fi technologies have undergone testing at the Leningrad NPP 1st power unit.

14 April 2020  THE BALAKOVO NPP INFORMATION AND PUBLIC RELATIONS ADMINISTRATION
The digital pattern of NPP operation has been introduced at the Balakovo NPP
The digital pattern of NPP operation has been introduced at the Balakovo NPP
A computer-aided maintenance management system (CAMMS) has been introduced at the Balakovo nuclear power plant. It was designed specifically for high-technology companies in the nuclear power industry.

14 April 2020  THE INFORMATION AND PUBLIC RELATION DEPARTMENT OF NOVOVORONEZH NPP
The Novovoronezh NPP: the newest automated control systems reduce the number of working hours for staff three-fold
The Novovoronezh NPP: the newest automated control systems reduce the number of working hours for staff three-fold
The automated control systems are used during the scheduled maintenance at the Novovoronezh NPP 7th power unit to control the quality of welded joints at the pipelines located in hard-to-reach places.

13 April 2020  COMMUNICATIONS DEPARTMENT OF ROSENERGOATOM
Rosenergoatom: the first containerized data centers have been installed at the Kalininsky DC
Rosenergoatom: the first containerized data centers have been installed at the Kalininsky DC
The deployment of containerized, or modular, data centers within the DC infrastructure hosted by Rosenergoatom (a part of the Electric power division of the Rosatom State Corporation) is one of the new services the Company is now offering to its commercial clients, alongside an opportunity to set up their own IT infrastructure for different projects, including but not limited to blockchain-related ones.

10 April 2020  The Kursk NPP Information and Public Relations Department
Another key milestone has been achieved at the Kursk NPP-2 one week ahead of schedule
Another key milestone has been achieved at the Kursk NPP-2 one week ahead of schedule
The 1st power unit emergency control room’s wall has been concreted at the Kursk NPP-2 construction site. The emergency control room is a part of the Kursk NPP-2 building set being constructed according to a VVER-TOI project, and it is designed to manage the reactor facility remotely.

8 April 2020  COMMUNICATIONS DEPARTMENT OF ROSENERGOATOM
In 2019, Rosenergoatom has allocated over 4.3 billion rules for environmental projects
In 2019, Rosenergoatom has allocated over 4.3 billion rules for environmental projects
The impact of the Rosenergoatom Joint-Stock Company’s (a part of the Electric power division of the Rosatom State Corporation) production is little; however, the company sticks to the production operation control at their plants, subsidiaries and affiliates with regard to the environmental safety, having a set of measures to facilitate these activities.

7 April 2020  THE KALININ NPP INFORMATION AND PUBLIC RELATIONS ADMINISTRATION
  A new reactor vessel inspection technology has been used for the first time in Russia at the Kalinin NPP 1st power block
A new reactor vessel inspection technology has been used for the first time in Russia at the Kalinin NPP 1st power block
The reactor vessel metal and the in-vessel devices have been inspected at the Kalinin NPP 1st power block using a modular delivery manipulator and television guidance system. This was the first time when this equipment was used at Russian pressurized water reactors.

3 April 2020  COMMUNICATIONS DEPARTMENT OF ROSENERGOATOM
Rosenergoatom: all measures are in place for the Russian NPP employees still at work to be safe
Rosenergoatom: all measures are in place for the Russian NPP employees still at work to be safe
The Russian NPPs (the affiliates of the Rosenergoatom Joint-Stock Company, the Electric power division of the Rosatom State Corporation) are taking all precautions to protect their employees’ health and safety and to facilitate business continuity at the plants.


Pages: Prev. 1 ... 3 4 5 6 7 ... 39 Next