RSS
Filter
Activity Start Date: Select date in calendarSelect date in calendar
  

25 June 2020  INFORMATION AND PUBLIC RELATIONS DEPARTMENT OF LENINGRAD NPP
The Leningrad NPP: the French team from MAN is leaving the construction site of the VVER-1200 2nd power unit. The services at the backup diesel generating sets have been fully completed
The Leningrad NPP: the French team from MAN is leaving the construction site of the VVER-1200 2nd power unit. The services at the backup diesel generating sets have been fully completed
On June 25, 2020, the VVER-1200 2nd power unit of the Leningrad NPP held a ceremony of completing the services on the check-out of the critical equipment – the high-capacity diesel generating sets. The works were delivered by a combined team of the Leningrad NPP specialists and the companies that have manufactured this equipment - MAN Energy Solutions France SAS and Moteurs Leroy Somer (France).

17 June 2020  COMMUNICATIONS DEPARTMENT OF ROSENERGOATOM
The Kalininsky Data Centre of the Rosenergoatom Joint-Stock Company has presented its own cloud storage to host the data of the e-learning platform Allis.School
The Kalininsky Data Centre of the Rosenergoatom Joint-Stock Company has presented its own cloud storage to host the data of the e-learning platform Allis.School
The e-learning platform Allis.School, which has been developed as a part of the ‘Digital school’ federal project, is one of the key components in a digital learning environment.

16 June 2020  INFORMATION AND PUBLIC RELATIONS DEPARTMENT OF LENINGRAD NPP
The Leningrad NPP: Rostekhnadzor has completed the readiness test for the physical launch of the 6th VVER-1200 power block
The Leningrad NPP: Rostekhnadzor has completed the readiness test for the physical launch of the 6th VVER-1200 power block
The commission from the Federal Service for Ecological, Technological and Nuclear Supervision (Rostekhnadzor) has completed a scheduled test to verify the Leningrad NPP VVER-1200 6th power block and confirmed it is highly ready to start the physical launch, which will be the first time when nuclear fuel us uploaded into the reactor core.

11 June 2020  INFORMATION AND PUBLIC RELATIONS DEPARTMENT OF LENINGRAD NPP
The ‘hot trial’ of the reactor facility at the Leningrad NPP-2 2nd power block has been completed
The ‘hot trial’ of the reactor facility at the Leningrad NPP-2 2nd power block has been completed
The ‘hot trial’ of the reactor facility, the last and the most extreme test preceding the physical start-up, has been completed at the Leningrad NPP-2 VVER-1200 2nd power block.

9 June 2020  COMMUNICATIONS DEPARTMENT OF ROSENERGOATOM
Rosenergoatom introduces e-learning for staff at Russian NPPs
Rosenergoatom introduces e-learning for staff at Russian NPPs
The Rosenergoatom Joint-Stock Company (as part of the Electric power division of the Rosatom State Corporation) has completed the testing of a virtual simulator prototype designed to train the electrotechnical personnel of the company. The prototype was developed by CROC Immersive Technologies, a department within an IT service provider CROC.

8 June 2020  THE INFORMATION AND PR DEPARTMENT OF THE BELOYARSK NPP
In 2022, the first Russian NPP power unit running fully on renewable fuel is to be launched
In 2022, the first Russian NPP power unit running fully on renewable fuel is to be launched
In 2022, the 4th power unit of the Beloyarsk NPP with a BN-800 fast-neutron reactor will be the first one in the history of our country to fully switch to uranium-plutonium MOX fuel. This will be an important step towards closure of the nuclear fuel cycle.

8 June 2020  THE ROSTOV NPP INFORMATION AND PUBLIC RELATIONS ADMINISTRATION
The Rostov NPP has obtained a license for the production of medical oxygen
The Rostov NPP has obtained a license for the production of medical oxygen
The Industry and Trade Ministry of the Russian Federation has issued a license for the production of pharmaceutical products, according to which the Rostov NPP will be delivering medical oxygen to health care facilities of its region.

5 June 2020  COMMUNICATIONS DEPARTMENT OF ROSENERGOATOM
The Rosenergoatom Joint-Stock Company has invested 4,304 billion rubles in environment protection in 2019
The Rosenergoatom Joint-Stock Company has invested 4,304 billion rubles in environment protection in 2019
The World Environment Day is celebrated on June 5th. The people of the nuclear power industry recognize this day together with professional environmentalists and socially responsible environment protection organizations. This is an important day for anyone who believes ecology is a universal value and has it in their DNA.

5 June 2020  The Kursk NPP Information and Public Relations Department
The second piece of the melt trap – the cantilever truss – has been installed at its final position at the Kursk NPP-2 construction site
The second piece of the melt trap – the cantilever truss – has been installed at its final position at the Kursk NPP-2 construction site
The cantilever truss, the second piece of the ‘melt trap’, with the weight of 145 tons and the diameter of over 9 meters, has been installed at its final position, under the reactor vault, at the Kursk NPP-2 second power unit. That said, one of the governmental assignments for 2020 has been completed.

2 June 2020  The Kursk NPP Information and Public Relations Department
The 1st reactor building of the Kursk NPP-2 has reached a mark of 36 meters
The 1st reactor building of the Kursk NPP-2 has reached a mark of 36 meters
The installation of the inner containment dome (ICD) made the 1st power block of the Kursk NPP-2 as tall as 36 meters. This is the third circle of the ICD, and the experts claim it has a very complicated structure.


Pages: Prev. 1 2 3 4 5 ... 39 Next