04.02.2015 

The Smolensk NPP: the plan for January made on 104.7%

The  Smolensk NPP power units developed 2 billion 364 million KWh in January, which exceeds the planned target by 107 million KWh.
The capacity factor (load factor) for the period amounted to 105.9%.

There are three power units operating at the moment at the Smolensk NPP. The total capacity is 3178 megawatts. There are no comments to the operation of the equipment.

The radiation background is unchanged and corresponds to natural values on an industrial platform of the Smolensk nuclear power plant and the surrounding territory.

The Smolensk nuclear power plant is a branch of the JSC "Concern Rosenergoatom". The SNPP annually issues on the average about 20 billion kilowatts hours of the electric power into country power supply system, that constitutes about 13% of the energy, developed in «Rosenergoatom Concern», and more than 80% of the Smolensk region energy, developed by the power entities.

Current information about radiation situation near the nuclear power plants in Russia and other objects of the nuclear industry is provided on the site www.russianatom.ru.

Round the clock telephone-answering machine works and obtains information about the work of nuclear power station in the social information Center of the Smolensk nuclear power plant.
Phone number: 8(48153) 3-21-24.



Back to the list