13 October 2016  Leningrad NPP Information and Public Relations Administration
The reheat and separation hydraulic control line of the Leningrad NPP’s 1st power block under construction has been 80% installed
Two reheat and separation hydraulic control lines of the Leningrad NPP’s 1st power block under construction have been installed. Two other control lines are being installed in accordance with the schedule. Four threads of pipelines are 80% completed.
12 October 2016  The Rostov NPP Information and Public Relations Administration
The Rostov NPP: the transformers’ outdoor installation oil cooler has been handed over for installation at the power block No.4 under construction
The transformers’ outdoor installation oil cooler has been handed over for installation at the Rostov NPP’s 4th power block under construction. In particular, the unit transformers were placed to convert the electric power generated by the turbine up to 500 kilowatt and to transfer it to the National grid of the country. The oil coolers are designed to cool those oil power transformers.
12 October 2016  Leningrad NPP Information and Public Relations Administration
The equipment cooling system lines’ ablution at the Leningrad NPP 1st power block’s nuclear island has been completed
The pipelines connecting the suction chambers of the nuclear island’s technological equipment cooling system and the spray pond of the Leningrad NPP 1st power block under construction have been fully abluted.
11 October 2016  The Kalinin NPP Information and Public Relations Administration
The Kalinin NPP is ready for operation during the fall and winter season
As a result of the Rosenergoatom Concern commission’s verification held on October 3-7, 2016, the Kalinin NPP was recommended to receive a production availability certificate for the fall and winter season. The commission was headed by Alexander Korniushkin, the chief technologist of the Safety and production control department of the Rosenergoatom Concern.
11 October 2016  Leningrad NPP Information and Public Relations Administration
The participants of the 11th International nuclear forum have paid a visit to the Leningrad NPP under construction
A delegation of the International nuclear forum dedicated to nuclear technologies safety organized by the Rosatom State Corporation and the Saint Petersburg affiliate of the NOU DPO Rosatom Central Advanced Training Institute has paid a visit to the Leningrad NPP’s substitution capabilities construction site.
7 October 2016  Leningrad NPP Information and Public Relations Administration
The Leningrad NPP: the last out of four cranes for nuclear fuel processing has been installed at the 1st power block
The mechanisms of a bridging electric crane with a capacity of 160/5 tons designed for fresh and spent nuclear fuel processing have been installed at the open transformer transfer unit of the Leningrad NPP under construction.
7 October 2016  The Balakovo NPP Information and Public Relations Administration
The Balakovo NPP has invested around 58 million rubles in environmental protection in 2015
The Balakovo NPP is the leading production enterprise in Balakovo in terms of environmental safety measures. For example, in 2015, the company invested 57.905 million rubles in environmental protection.
5 October 2016  Novovoronezh NPP Information and Public Relations Administration
The Novovoronezh NPP: Russia may become a partner for South Africa in its nuclear power development program
A delegation from South Africa has paid a visit to the Novovoronezh NPP (an affiliate company of the Rosenergoatom Concern) to get acquainted with the modern 3+ generation power block.
4 October 2016  Information and Public Relations Administration Rosenergoatom Concern JSC
Rosenergoatom: the construction of the worldХs first floating NPPХs coastal infrastructure has started in the city of Pevek
Rosenergoatom: the construction of the worldХs first floating NPPХs coastal infrastructure has started in the city of Pevek
On October 4th, 2016, the solemn ceremony of the first sheet pile diving into the foundation of the coastal infrastructure for the one-of-a-kind floating nuclear heat and power plant (FNHPP) “Lomonosov the Academician” took part in Pevek (the Chukotka Autonomous Region), the most northern city in Russia.
3 October 2016  Smolensk NPP Information and Public Relations Administration
The Smolensk NPP has invested over 200 million rubles for the major environment protection activities in 2015
According to Svetlana Aksenova, the head of the Smolensk NPP’s environment protection department, in 2015, the NPP has invested 16 million rubles more compared to 2014 into the environment protection activities. The total sum invested accounted for 203 million rubles.