Filter
Activity Start Date: Select date in calendarSelect date in calendar
  

1 September 2018  THE INFORMATION AND PUBLIC RELATION DEPARTMENT OF NOVOVORONEZH NPP
  The final large stage of pre-commissioning works before the physical start-up – the hot trial of the reactor unit – has started at the power unit No 2 of Novovoronezh NPP-2
The final large stage of pre-commissioning works before the physical start-up – the hot trial of the reactor unit – has started at the power unit No 2 of Novovoronezh NPP-2
On 1 September, 2018 at the power unit No 2 of Novovoronezh NPP-2 (No 7 of NVNPP) the specialists proceeded to the final large stage of the pre-commissioning works before the physical start-up – the hot phase of the cold and hot trial (CHT) of the equipment that have to prove the working capacity of the main and auxiliary equipment and systems of the reactor unit in design modes on working parameters.

29 August 2018  THE ROSTOV NPP INFORMATION AND PUBLIC RELATIONS ADMINISTRATION
Rostov NPP: the power unit No 2 is put into industrial operation at the capacity level of 104%
Rostov NPP: the power unit No 2 is put into industrial operation at the capacity level of 104%
On 28 August the Federal Environmental, Industrial and Nuclear Supervision Service of Russia (Rostekhnadzor) made amendments in the conditions of validity of the license for operation of Rostov NPP power unit No 2 (Volgodonsk, a subsidiary of Rosenergoatom JSC, a part of Rosatom’s Electric Power Division) that permit its industrial operation at the capacity level of 104% from nominal level.

22 August 2018  INFORMATION AND PUBLIC RELATIONS DEPARTMENT OF LENINGRAD NPP
VVER-1200 power unit No 1 of Leningrad NPP has successfully passed the final test and is ready for commissioning
VVER-1200 power unit No 1 of Leningrad NPP has successfully passed the final test and is ready for commissioning
Leningrad NPP has completed the unit complex tests. The new nuclear colossus of the generation 3+ with the VVER-1200 reactor unit has worked without any complaint throughout the entire period of testing. Within 15 days its equipment and systems has been operating safely, effectively, and reliably in full accordance with the project.

17 August 2018  THE COMMUNICATIONS DEPARTMENT OF ROSENERGOATOM
Rosenergoatom: the additional electric energy generation by Russian NPPs exceeded 5 billion kWh in 2018
Rosenergoatom: the additional electric energy generation by Russian NPPs exceeded 5 billion kWh in 2018
The additional electric energy generation by Russian NPPs (branches of Rosenergoatom JSC, part of Rosatom’s Electric Energy Division) has already exceeded 5 billion kilowatt-hours in 2018.

9 August 2018  KURSK NPP INFORMATION AND PUBLIC RELATIONS ADMINISTRATION
“It is planned to place reactor vessel of the power unit No 1 of Kursk NPP-2 at its proper location in 2020”, Andrey Petrov, the Head of Rosenergoatom
“It is planned to place reactor vessel of the power unit No 1 of Kursk NPP-2 at its proper location in 2020”, Andrey Petrov, the Head of Rosenergoatom
The reactor vessel of the VVER-TOI power unit No 1 of Kursk NPP-2 is planned to be placed at its proper location in 2020. It was told by the Director General of Rosenergoatom JSC (a part of Rosatom’s Electric Energy Division) Andrey Petrov during the working trip to Kurchatov (Kursk Oblast).

6 August 2018  INFORMATION AND PUBLIC RELATIONS DEPARTMENT OF LENINGRAD NPP
Leningrad NPP: the assembly of the turbine island main equipment has been completed at the construction site of the innovative power unit No 2
Leningrad NPP: the assembly of the turbine island main equipment has been completed at the construction site of the innovative power unit No 2
At the construction site of the innovative power unit No 2 with the VVER-1200 reactor of Leningrad NPP, the specialists completed the assembly of all the main equipment of the turbine building. The work inside the turbine building is conducted according to the schedule.

1 August 2018  THE INFORMATION AND PUBLIC RELATION DEPARTMENT OF NOVOVORONEZH NPP
Cold and hot trials of the 2nd unit equipment have begun at Novovoronezh NPP-2
Cold and hot trials of the 2nd unit equipment have begun at Novovoronezh NPP-2
At the power unit No 2 of Novovoronezh NPP-2 (Unit No 7 of NVNPP) the stage of cold and hot trials of the equipment (CHT) has started.

25 July 2018  THE COMMUNICATIONS DEPARTMENT OF Rosenergoatom
The world’s first floating power unit Akademik Lomonosov, designed for energy supply to Chukotka, has started loading nuclear fuel into its reactors
The world’s first floating power unit Akademik Lomonosov, designed for energy supply to Chukotka, has started loading nuclear fuel into its reactors
On 25 July, 2018, the world's only floating nuclear power unit (FNPU) Akademik Lomonosov located at the site of Atomflot FSUE (Rosatom’s subsidiary) in Murmansk, started loading nuclear fuel into the reactors. The readiness to start the loading activity was confirmed by Rostekhnadzor the day before.

16 July 2018  INFORMATION AND PUBLIC RELATIONS DEPARTMENT OF LENINGRAD NPP
Leningrad NPP: the welding of the main circulation pipeline is completed at the power unit No 2 with the VVER-1200 reactor ahead of schedule
Leningrad NPP: the welding of the main circulation pipeline is completed at the power unit No 2 with the VVER-1200 reactor ahead of schedule
At the second power unit with VVER-1200 reactor of Leningrad NPP, the welding of the pearlite part and heat treatment of the joints of the main circulation pipeline (MCP) have been completed. All elements of the pipeline are interconnected and welded to the reactor shell, steam generators and main circulation pumps.

9 July 2018  KOLSK NPP INFORMATION AND PUBLIC RELATIONS ADMINISTRATION
Kola NPP has received an operating license for the 1st power unit from Rostekhnadzor
Kola NPP has received an operating license for the 1st power unit from Rostekhnadzor
On 6 July, 2018, the Federal Environmental, Industrial and Nuclear Supervision Service issued a license for the operation of Kola NPP power unit No 1 for the next 15 years, until 6 July, 2033.

2 July 2018  KURSK NPP INFORMATION AND PUBLIC RELATIONS ADMINISTRATION
At the construction site of Kursk NPP-2 the specialists completed the concreting of the bed plate of power unit No 1 reactor building
At the construction site of Kursk NPP-2 the specialists completed the concreting of the bed plate of power unit No 1 reactor building
On 30 June, 2018 at the construction site of Kursk NPP-2* replacement plant the constructors and adjusters completed the concreting of the bed plate of power unit No 1 reactor building. Thus, one of this year’s key stages of VVER-TOI power unit construction is completed.

28 June 2018  INFORMATION AND PUBLIC RELATIONS DEPARTMENT OF LENINGRAD NPP
Leningrad NPP-2: at the VVER-1200 power unit No 2 under construction the dome of the inner reactor containment was established
Leningrad NPP-2: at the VVER-1200 power unit No 2 under construction the dome of the inner reactor containment was established
At Leningrad NPP-2 VVER-1200 power unit No 2 under construction the last element of the inner reactor containment - the dome of leak-tight facing with weight of 200 tons was installed. The dome was lifted with the help of superpower Liebherr crane which arm was built for another section of 12 meters.

19 June 2018 
The readiness of the new power unit No 4 of Rostov NPP for commercial operation is confirmed
The readiness of the new power unit No 4 of Rostov NPP for commercial operation is confirmed
On 19 June, 2018, the 4th power unit of Rostov NPP (Volgodonsk, a branch of Rosenergoatom JSC, a part of Rosatom’s Electric Power Division) successfully completed the commissioning tests (complex testing) before the unit was put into commercial operation.

15 June 2018  INFORMATION AND PUBLIC RELATIONS DEPARTMENT OF LENINGRAD NPP
Leningrad NPP: in Russia Day the new super powerful unit with VVER-1200 reactor was put at 100% power for the first time
Leningrad NPP: in Russia Day the new super powerful unit with VVER-1200 reactor was put at 100% power for the first time
On 12 June the innovative power unit No 1 of Leningrad NPP-2 (with VVER-1200 reactor) was put at full design capacity for the first time.

9 June 2018  INFORMATION AND PUBLIC RELATIONS DEPARTMENT OF LENINGRAD NPP
Leningrad NPP-2: the reactor unit of the innovative VVER-1200 power unit No 1 is put into 90% capacity for the first time
Leningrad NPP-2: the reactor unit of the innovative VVER-1200 power unit No 1 is put into 90% capacity for the first time
The innovative Generation III+ power No 1 with VVER-1200 reactor of Leningrad NPP-2 (a Rosenergoatom’s branch, a part of Rosatom State Corporation’s Electric Energy Division) that has been at the pilot and industrial operation since 26 March was put into 90% capacity.

31 May 2018  The Rosenergoatom, Joint-Stock Company information and PR department
Rosenergoatom: Balakovo NPP was recognized as the best Russian NPP
Rosenergoatom: Balakovo NPP was recognized as the best Russian NPP
The results of the traditional corporative competition - the Best NPP of Russia held by Rosenergoatom JSC (a part of Electric Power Division of Rosatom State Corporation) were summed upon the work of Russian NPPs in 2017.

19 May 2018  Department of information and public relations of Rosenergoatom
Floating nuclear power unit Lomonosov has arrived in Murmansk to be loaded with fuel
Floating nuclear power unit Lomonosov has arrived in Murmansk to be loaded with fuel
Murmansk, 19 May 2018 – Akademik Lomonosov, the nuclear floating power unit (FPU), has been moored in Murmansk where it was towed from Saint Petersburg to be loaded with fuel.

17 May 2018  Department of information and public relations of Rosenergoatom
Rosenergoatom: the world’s first floating power unit (FPU) Akademik Lomonosov has entered Kola Bay
Rosenergoatom: the world’s first floating power unit (FPU) Akademik Lomonosov has entered Kola Bay
The world’s only floating power unit (FPU)* Akademik Lomonosov that left the territory of Baltiyskiy Zavod in St. Petersburg on 28 April, 2018 has successfully arrived to Kola Bay.

15 May 2018  Department of information and public relations of Rosenergoatom
During ATOMEXPO 2018 Rosenergoatom and Belarusian NPP have signed a Framework Agreement on scientific and technical cooperation
During ATOMEXPO 2018 Rosenergoatom and Belarusian NPP have signed a Framework Agreement on scientific and technical cooperation
On 14 May, 2018 Rosenergoatom JSC (a part of Rosatom’s Electric Energy Division) and Belarusian NPP RUE signed a Framework Agreement on scientific and technical cooperation.

8 May 2018  NOVOVORONEZH NPP INFORMATION AND PUBLIC RELATIONS ADMINISTRATION
The reactor vessel has been annealed at the power unit No 4 of Novovoronezh NPP
The reactor vessel has been annealed at the power unit No 4 of Novovoronezh NPP
At Novovoronezh NPP, the specialists have completed one of the key operations of the stage of the 4th unit modernization – reactor vessel annealing.


Pages: Prev. 1 ... 7 8 9 10 11 ... 18 Next